Toggle menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Emergency Preparedness Drill: Difference between revisions

From North Forge
No edit summary
No edit summary
Line 1: Line 1:
{{Discuss |
{{Discuss | Safety
Apparently we are supposed to hold one before each meeting?  
Apparently we are supposed to hold one before each meeting?  
}}
}}
As per https://northforge.ca//wp-content/uploads/2023/01/North-Forge-Safety-Manual-Winnipeg_Oct.21-22.pdf:  
As per https://northforge.ca//wp-content/uploads/2023/01/North-Forge-Safety-Manual-Winnipeg_Oct.21-22.pdf:  
  Emergency preparedness drills will be conducted once every three months (before every Safety Committee Meeting) as our building code occupancy is F2. All members on-site should be notified in advance of the drill. An incident should be simulated and observations made of the response. A post-drill meeting should be conducted to review the response and address any deficiencies.
  Emergency preparedness drills will be conducted once every three months (before every Safety Committee Meeting) as our building code occupancy is F2. All members on-site should be notified in advance of the drill. An incident should be simulated and observations made of the response. A post-drill meeting should be conducted to review the response and address any deficiencies.

Revision as of 15:54, 2024 September 9

for all

Safety

Apparently we are supposed to hold one before each meeting?

  • Cargo


  • Categories

As per https://northforge.ca//wp-content/uploads/2023/01/North-Forge-Safety-Manual-Winnipeg_Oct.21-22.pdf:

Emergency preparedness drills will be conducted once every three months (before every Safety Committee Meeting) as our building code occupancy is F2. All members on-site should be notified in advance of the drill. An incident should be simulated and observations made of the response. A post-drill meeting should be conducted to review the response and address any deficiencies.