Toggle menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Emergency Preparedness Drill: Difference between revisions

From North Forge
Created page with "{{Discuss | Apparently we are supposed to hold one before each meeting? }}"
 
No edit summary
Line 2: Line 2:
Apparently we are supposed to hold one before each meeting?  
Apparently we are supposed to hold one before each meeting?  
}}
}}
As per https://northforge.ca//wp-content/uploads/2023/01/North-Forge-Safety-Manual-Winnipeg_Oct.21-22.pdf:
Emergency preparedness drills will be conducted once every three months (before every Safety Committee Meeting) as our building code occupancy is F2. All members on-site should be notified in advance of the drill. An incident should be simulated and observations made of the response. A post-drill meeting should be conducted to review the response and address any deficiencies.

Revision as of 15:41, 2024 September 9

for all

Apparently we are supposed to hold one before each meeting?

  • Cargo


  • Categories

As per https://northforge.ca//wp-content/uploads/2023/01/North-Forge-Safety-Manual-Winnipeg_Oct.21-22.pdf:

Emergency preparedness drills will be conducted once every three months (before every Safety Committee Meeting) as our building code occupancy is F2. All members on-site should be notified in advance of the drill. An incident should be simulated and observations made of the response. A post-drill meeting should be conducted to review the response and address any deficiencies.