Toggle menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Emergency Preparedness Drill: Difference between revisions

From North Forge
Created page with "{{Discuss | Apparently we are supposed to hold one before each meeting? }}"
 
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Discuss |
{{Discuss | Safety
Apparently we are supposed to hold one before each meeting?  
* Apparently we are supposed to hold one before each meeting?
* The {{act}} doesn't seem to specify this. Could we meet whatever specifically requires this in a different way?
}}
}}
As per https://northforge.ca//wp-content/uploads/2023/01/North-Forge-Safety-Manual-Winnipeg_Oct.21-22.pdf:
Emergency preparedness drills will be conducted once every three months (before every Safety Committee Meeting) as our building code occupancy is F2. All members on-site should be notified in advance of the drill. An incident should be simulated and observations made of the response. A post-drill meeting should be conducted to review the response and address any deficiencies.

Latest revision as of 11:19, 2024 October 15

for all

Safety
  • Cargo


  • Categories

As per https://northforge.ca//wp-content/uploads/2023/01/North-Forge-Safety-Manual-Winnipeg_Oct.21-22.pdf:

Emergency preparedness drills will be conducted once every three months (before every Safety Committee Meeting) as our building code occupancy is F2. All members on-site should be notified in advance of the drill. An incident should be simulated and observations made of the response. A post-drill meeting should be conducted to review the response and address any deficiencies.